Mail Us:
info@acuityconsultancy.in
Call Us:
+91 891 038 3521
Project
Steel decks using Fortress section
BIM modeling of Steel decks using fortress and preparation of GA drawings and extracting material take off .
Project Status
Completed
Completed On
October 2025
Project Location
China
Project Duration
2 Months
Client Details
Private Client
Project Type
Software Used
Services Included
Project Overview
We provided comprehensive BIM consultancy for the construction of a modern deck for the stings and accommodations. The structure was engineered using the Fortress system—utilizing high-strength, thin-walled Rectangular Hollow Sections (RHS) to create a lightweight yet durable frame. The main challenge was calculating all meterial take off with details of fittings.
More Projects
Steel Pipe rack with platform
18/02/2026Underground Oil Tank
15/02/2026Three Story shopping Mall
15/02/2026Two Story Villa
15/02/2026Silo Tower
15/02/2026Inspired by this project?
Start your next project with our expert team and experience a smarter, more efficient project workflow.




