Project

Steel decks using Fortress section

BIM modeling of Steel decks using fortress and preparation of GA drawings and extracting material take off .

Project Status

Completed

Completed On

October 2025

Project Location

China

Project Duration

2 Months

Client Details

Private Client

Project Type

Software Used

Project Overview

We provided comprehensive BIM consultancy for the construction of a modern deck for the stings and accommodations. The structure was engineered using the Fortress system—utilizing high-strength, thin-walled Rectangular Hollow Sections (RHS) to create a lightweight yet durable frame. The main challenge was calculating all meterial take off with details of fittings.

Project Gallery

Inspired by this project?

Start your next project with our expert team and experience a smarter, more efficient project workflow.